Search
Lead container Classic in the group Art Supplies / Art Accessories / Storage at Pen Store (101379)
0

Lead container Classic

18.90
incl. VAT
 

Frequently Bought Together

More Mono Plastic Eraser XS Mono Plastic Eraser XS
Buy!
Tombow
Mono Plastic Eraser XS
1.60 €
More Mono Dust Catch Eraser Mono Dust Catch Eraser
Buy!
Tombow
Mono Dust Catch Eraser
2.90 €
More Modelling Clay 1 kg Modelling Clay 1 kg
3
DAS
Modelling Clay 1 kg
7 €
More Manga Drawing Pad A4
Buy!
Sakura
Manga Drawing Pad A4
13.50 €
Container for leads made of raw brass. 8,6 cm long and hexagon shaped. ystudio is from Taiwan, founded in 2012. They explore vanishing culture, devote themselves to linking past memories and modern life, make fine artifacts for whoever is serious with their life.
Article nr: 101379

More from Art Supplies / Art Accessories / Storage

More Artcare Project Bag A4
Buy!
Mapac
Artcare Project Bag A4
4 €
More ST 350 Cantilever Toolbox Black
Buy!
TOYO Steel Company
ST 350 Cantilever Toolbox Black
135.50 €
More ST 350 Cantilever Toolbox Silver ST 350 Cantilever Toolbox Silver
Buy!
TOYO Steel Company
ST 350 Cantilever Toolbox Silver
135.50 €
More DIY Mini Storage 4 Drawers DIY Mini Storage 4 Drawers
Buy!
Creativ Company
DIY Mini Storage 4 Drawers
15.50 €
More Goldfaber Pencil Roll Goldfaber Pencil Roll
Buy!
Faber-Castell
Goldfaber Pencil Roll
13.90 €
More A4 envelope folder Pack of 5 A4 envelope folder Pack of 5
Buy!
HERMA
A4 envelope folder Pack of 5
12.50 €
More Y350 Camber Top Toolbox Green Sea
Buy!
TOYO Steel Company
Y350 Camber Top Toolbox Green Sea
55.50 €
More T360 Trunk Shape Toolbox Beige T360 Trunk Shape Toolbox Beige
Buy!
TOYO Steel Company
T360 Trunk Shape Toolbox Beige
79.90 €
More Storage box with 7 trays Storage box with 7 trays
33%
Buy!
Raaco
Storage box with 7 trays
4.74 € 7.90 €
More Brush Case Short brushes 17 pockets
33%
Buy!
Pen Store Arts
Brush Case Short brushes 17 pockets
8.10 € 13.50 €
Login

Lowest price 1-30 days before price reduction:

The reference price is the lowest price applied to the product 1-30 days before the relevant price cut was implemented. The exception is if gradual reductions have been made, in which case the lowest price 1-30 days before the first price reduction is shown.